Day By Day 2008 by Riva 1920

Product name

Day By Day 2008

Brand

Riva 1920

Delivery time 9 to 12 weeks
Made in Italy
Description

Table made entirely in solid wood with a top having glued boards and legs in linear continuity with the top surface.Finish: base of oil / natural wax of vegetable origin with pine extracts.

Please contact us for pricing